Epicor BAQ for On-Time Delivery: How to Report Late Orders and Delivery Risks

An on-time delivery report should do more than show that an order is late. It should help your team see what is late now, what is likely to become late next, and what may be causing the delay.

That is where a well-built BAQ matters. In Epicor ERP, BAQs are still one of the best ways to pull usable data out of the system and turn it into something teams can act on quickly.

Why On-Time Delivery Reporting Matters in Epicor ERP

On-time delivery is one of the most watched service metrics in manufacturing. The problem is that many teams still track it with spreadsheets, manual filters, and disconnected logic.

That creates a report that shows what is late, but not what to do next.

A good BAQ gives customer service, shipping, planning, and leadership one place to work from the same logic. That makes the report easier to trust and much easier to use.

What an On-Time Delivery BAQ Should Show

A good BAQ should answer two questions right away. First, which orders are late right now. Second, why they are late or likely to become late.

That means the report needs the right fields, not every possible field.

Core Delivery Fields

Start with the fields that help users identify the order and measure lateness clearly. That usually includes the order number, customer name, part number, line number, request date, promise date, need-by date, ship-by date, open quantity, shipped quantity, and the line or release status.

These fields give users the basic delivery picture. They show what the customer expected, what the business committed to, and what still needs to move.

Supporting Context Fields

Then add the fields that help explain the delay. That often includes the job number, plant or warehouse, order hold flag, credit hold status, inventory availability, release status, job completion status, and shipment status.

This is what turns the BAQ into a useful operational report. Instead of telling users that something is wrong, it helps point them toward the reason.

How to Separate Late, At-Risk, and On-Time Orders

One of the easiest ways to make this BAQ more useful is to stop treating all orders the same.

Some are already late. Some are close to becoming late. Some shipped on time and should remain in the data so the business can measure real performance.

Late Orders

Late orders are usually the easiest group to define. In most cases, the promise date or need-by date has passed and there is still open quantity on the order.

The key is to use one rule consistently. If your business measures service against promise date, use promise date. If it measures against need-by date, use that instead.

At-Risk Orders

At-risk orders are where the BAQ becomes more valuable. These orders are not late yet, but they are close enough that someone should be paying attention.

That could mean the promise date is within the next few days and the order is still open. It could also mean the due date is close and the release or job is not ready.

This gives teams time to act before the order becomes a customer issue.

On-Time Shipped Orders

It is also useful to keep a clean category for orders that shipped on time. That gives the business a true service view instead of a problem-only view.

If you only report on late orders, you can see the backlog of issues. If you also track on-time shipped orders, you can measure actual performance.

Common Mistakes When Building an On-Time Delivery BAQ

Many BAQs become harder than they need to be. The goal is not to build the most complex query possible. The goal is to build something people can use quickly and trust.

Too Many Fields

This is one of the most common mistakes. The report turns into a dump of every available field instead of a clean operational view.

If users have to scroll sideways just to understand one late order, the BAQ is trying to do too much.

No Clear Late Logic

If one user thinks late means past need-by date and another thinks it means past promise date, the report will create arguments instead of clarity.

Pick the rule first. Then build the BAQ around that rule.

No Reason Flags

A report with no reason flags usually creates follow-up work. It tells the user there is a problem but gives them no clue where to start.

Even simple reason logic makes a big difference. It turns the BAQ from a list into a tool.

Talk to TeccWeb About Epicor BAQs

A good BAQ should save time, not create more cleanup. If your on-time delivery report still feels too manual, too noisy, or too hard to trust, the logic probably needs work.

TeccWeb helps Epicor users build BAQs that people actually use. 

If you want an on-time delivery BAQ that shows what is late, what is at risk, and what your team should look at next, talk to TeccWeb.